http://repositorio.unb.br/handle/10482/37801
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
ARTIGO_DevelopmentRadiofrequencyAblation.pdf | 2,91 MB | Adobe PDF | Visualizar/Abrir |
Título: | Development of radiofrequency ablation device for surgical hepatocellular carcinoma treatment in agreement with Brazilian standards |
Autor(es): | Cavalcante, Gilvandson Costa Lima, Flávio Ferreira Venturin, Murilo Jacobi, Ricardo Pezzuol Rosa, Suélia de Siqueira Rodrigues Fleury |
Assunto: | Hospitais - mobiliário e equipamento Tratamento cirúrgico Carcinoma hepatocelular |
Data de publicação: | Jun-2018 |
Editora: | Sociedade Brasileira de Engenharia Biomédica |
Referência: | CAVALCANTE, Gilvandson Costa et al. Desenvolvimento de dispositivo de ablação por radiofreqüência para tratamento cirúrgico de carcinoma hepatocelular de acordo com as normas brasileiras. Research on Biomedical Engineering, Rio de Janeiro, v. 34, n. 2, p. 115-126, abr./jun. 2018. DOI: https://doi.org/10.1590/2446-4740.07517. Disponível em: http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2446-47402018000200115&lng=en&nrm=iso. Acesso em: 19 maio 2020. Epub 17 maio 2018. |
Abstract: | Introduction Many studies have been carried out on the main causes of hepatocellular carcinoma (HCC) to identify suitable diagnosis methods and treatments to combat the disease. However, high equipment costs and the lack of hepatic-ablation technologies manufactured in Brazil encourage the design and implementation of a solution based on normative principles. Methods The analysis and description of equipment features were the first steps in defining the design requirements and constraints. Equipment functionalities were evaluated with three assays set by NBR-IEC 60601-2-2. Results The assays of output control adjustment accuracy, output control adjustment monotonicity, and signal quality evaluation using the crest factor (CF) for the equipment showed thresholds superior to the aforementioned standard. Conclusion State-of-the-art studies have contributed the equipment construction. The construction process was validated by assays to ensure the equipment functionality with raw materials at acceptable costs. The test results showed the superiority of the equipment in relation to the assays proposed by the standard NBR-IEC 60601-2-2. However, to convert the prototype into a commercial product, other analyses are necessary. |
Unidade Acadêmica: | Faculdade UnB Gama (FGA) |
Licença: | (CC BY) - This is an Open Access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. |
DOI: | https://doi.org/10.1590/2446-4740.07517 |
Aparece nas coleções: | Artigos publicados em periódicos e afins |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.